Matthews build  a bespoke incineration facility housed within a new dedicated building for the Department of Infrastructure at La Collette Jersey

DESIGN OPERATION

  • 24 h/day
  • 7 days/week
  • 312 days/year
  • (7500h/year: 85.6%availability)

EMISSIONS

200kg/hr waste incineration facility in accordance with
the EUWID (Waste incineration directive 2000/76/EU).

INSTALLATION

Jersey, La Collette - Department of Infrastructure

SCOPE OF PROJECT

  • Bin weigh systems
  • Bin handling and elevator systems
  • Ram loader
  • Stepped hearth primary combustion chamber
  • 2 Second residence time secondary chamber @1100°C
  • Diesel storage and delivery system
  • Wet ash conveyor
  • Hot gas transfer ducts
  • Urea injection Nox reduction system
  • Emergency bypass system
  • Waste heat hot water heat exchanger
  • Cool gas transfer ducts
  • Activated carbon injection system
  • Sodium Bicarbonate injection system
  • Flue gas abatement system
  • Compressed air system
  • Continuous emission monitors
  • Remotely monitored controls system
  • Induced draught fan and acousticenclosure
  • Exhaust Chimney
  • Hot water recirculation system
  • Hot water cooler
  • Bin washing system
  • Installation
  • Commissioning
  • Emission Testing